HOTEL AFRICA |
PIEUX ET RIDEAUX PALPLANCHES |
1963 |
200.000 DT |
Pieux Forés 5.000 ML |
HOTEL DU LAC |
PIEUX BATTUS |
1968 |
150.000 DT |
Pieux Battus 2.000 ML |
O.P.N.T. |
PIEUX SILOS A CEREALES LA GOULETTE |
1971 |
200.000 DT |
Pieux Battus 2.100 ML |
IMMOBILIERE
DE L'AVENUE |
PIEUX FORES AVENUE DE PARIS ET AVENUE JEANS JAURES |
1972 |
350.000 DT |
Pieux Forés 6.000 ML |
C.P.G. |
PIEUX D'UN PORTIQUE DE CHARGEMENT A LA GOULETTE |
1975 |
160.000 DT |
1.500 ML |
S.E.P.A. |
PIEUX USINE SEPA A GABES |
1977 |
1.312.000 DT |
1.000 ML |
S. T. B. |
PIEUX NOUVEAU SIEGE S.T.B. |
1982 |
847.000 DT |
9.000 ML |
AFRIQUE TRAVAUX |
PIEUX OUVRAGE METRO LEGER |
1982 |
67.000 DT |
700 ML |
STAM |
PIEUX DEVIATION SOUSSE LOT 7C |
1982 |
37.000 DT |
250 ML |
C.N.S.S. |
PIEUX + 2 SOUS SOLS SIEGE |
1983 |
300.000 DT |
750 ML |
T.P.I. |
PIEUX FORES DAP/NPK - GABES |
1983 |
357.000 DT |
3.600 ML |
S.N.I.T. |
PIEUX A BAB SAADOUN (AV.9AVRIL) |
1983 |
60.000 DT |
500 ML |
SATRE FRIGID. |
PIEUX HOTEL AMBASSADEUR TUNIS |
1983 |
269.000 DT |
Pieux Battus 4.550 ML |
AFRIQUE TRAVAUX |
PIEUX OUVRAGE SUR OUED MEJERDA |
1983 |
87.000 DT |
150 ML |
STAM |
PIEUX PONT OUED LAHMAR |
1983 |
52.000 DT |
135 ML |
A.T.B. |
PIEUX NOUVEAU SIEGE |
1984 |
549.000 DT |
4.950 ML |
EL BARAKA IMM |
PIEUX IMMEUBLE LE PASSAGE |
1984 |
188.000 DT |
1.000 ML |
EL BARAKA IMM |
PIEUX IMMEUBLE RUE DE TURQUIE |
1985 |
363.000 DT |
2.200 ML |
NORD GAZ |
PIEUX SPHERE GAZ LA GOULETTE |
1986 |
203.000 DT |
600 ML |
SUD GAZ |
PIEUX SPHERE GAZ GABES |
1986 |
91.000 DT |
500 ML |
B.N.T. |
PIEUX NOUVEAU SIEGE |
1986 |
848.000 DT |
700 ML |
DOC.HADDAD |
PIEUX IMM.DR HADDAD - TUNIS |
1988 |
160.000 DT |
650 ML |
SAPRIM |
PIEUX GABES CENTRE |
1988 |
58.000 DT |
627 ML |
EL WAFA |
IMM.GALAXIE 2000 TUNIS |
1989 |
125.000 DT |
Pieux Battus 1.404 ML |
SOCOMENA |
PIEUX MOULEE 6 MENZEL BOURG |
1990 |
330.000 DT |
600 ML |
MINISTERE DE L'EQUIPEMENT |
PONT SUCRERIE JENDOUBA |
1990 |
113.000 DT |
345 ML |
STE CARLTON |
PIEUX HOTEL CARLTON |
1990 |
300.000 DT |
1.650 ML |
SAPRIM |
PIEUX IMM.EL MOSTAKBEL TUNIS |
1992 |
300.000 DT |
1.800 ML |
ROUSSEL S.A. |
PIEUX USINE DE MEGRINE |
1991 |
638.000 DT |
4.900 ML |
S.M.L.T. |
CENTRALE DE TELECOMMUNICATION |
1992 |
670.000 DT |
PIEUX FORES 2.720 ML |
HYDRAUTECHNIKA |
BARRAGE SEJNANE |
1992 |
82.500 DT |
PIEUX FORES 375 ML |
ONAS |
STATION D'EPURATION MAHRES |
1992 |
174.000 DT |
Pieux Battus+Palplanches 1.140 ML |
S.M.B. |
PIEUX INST.PORTUAIRE GOULETTE |
1993 |
1.017.000 DT |
Pieux Forés 3.500 ML (PRF 38m)
+ Palplanches |
MINISTERE DE L'EQUIPEMENT |
PIEUX PONT OUED ZARGA |
1993 |
109.000 DT |
825 ML |
S.N.C.F.T. |
PIEUX PONT OUED KHEROUA |
1993 |
429.467 DT |
600 ML |
S.N.C.F.T. |
PIEUX 2 OUVRAGES HENCHIR SOUATIR |
1993 |
381.520 DT |
400 ML |
SOIMI / SIAPE |
PIEUX INSTALLATIONS SO2-SIAPE |
1993 |
825.000 DT |
Pieux Forés 616 ML |
E.AGNESE/OPNT |
BATTAGE PIEUX METALLIQUES ET RIDEAUX PALPLANCHES |
1994 |
164.000 DT |
PORT LA GOULETTE |
MINISTERE DE L'EQUIPEMENT |
PIEUX PONT SUR OUED HAJJAR KELIBIA |
1994/1995 |
150.000 DT |
450 ML |
MINISTERE DE L'EQUIPEMENT |
PIEUX PONT SUR OUED MLIZ JENDOUBA |
1994/1995 |
165.000 DT |
450 ML |
OPAT |
AER. TUNIS CARTHAGE COUR SUD - BATIMENT SATTELITE |
1995/1996 |
500.000 DT |
Pieux Battus 1.400 ML |
S.N.C.F.T. |
PIEUX PONT ACHICHINA S.N.C.F.T. |
1996/1997 |
400.000 DT |
1.100 ML |
OPAT |
EXTENSION AEROPORT TUNIS - CARTHAGE PIEUX FORES VIADUC |
1996/1997 |
1.500.000 DT |
250 Pieux Forés + Palplanches 500 ML |
AFH |
PIEUX PONT OUED SOLTANE |
1996/1997 |
450.000 DT |
1.320 ML |
S.N.C.F.T. |
PIEUX PONT OUED MELIANE RADES |
1997 |
120.000 DT |
Palplanches 360 ML |
S.N.C.F.T. |
PIEUX PONT OUED DEFLA BIR BOU REGBA |
1997 |
80.000 DT |
|
MINISTERE DE L'EQUIPEMENT |
PIEUX PONT OUED HAMMEM |
1998 |
220,000 DT |
616 ML |
CIL |
PIEUX + PAROI MOULEE IMMEUBLE JEAN JAURES |
1998/1999 |
975.000 DT |
Pieux Forés (Prof. 45m) + Palplanches |
LAFAYETTE CENTRE |
PIEUX + PAROI MOULEE |
1999 |
740.000 DT |
|
EYL |
CENTRE DES CHEQUES POSTAUX TUNIS |
1999 |
1.013.000 DT |
Pieux Forés 3795 ML (PRF 55m) + Palplanches |
SMLT |
DEPOT DE PEINTURE SMLT |
2000 |
360.000 DT |
Pieux Forés 1200 ML (PRF 45m) |
MINISTERE DE L'EQUIPEMENT |
PIEUX PONT OUED HATAB |
2000 |
300.000 DT |
Pieux Forés 800 ML (PRF 25m) |
MINISTERE DE L'EQUIPEMENT |
PIEUX PONT OUED SBIBA |
2000 |
260.000 DT |
Pieux Forés |
ALSTOM |
PIEUX POSTES BLINDES - LA GOULETTE |
2000 |
565.000 DT |
Pieux Forés 1800 ML (PRF 40m) + Palplanches |
OMMP |
QUAI DE COMMERCE DE BIZERTE |
1999/2000 |
6.000.000 DT |
Pieux + Palplanches |
TUNISIE AUTOROUTE |
PIEUX DES OUVRAGES D'ART AUTOROUTE TUNIS-BIZERTE |
2000/2001 |
2.800.000 DT |
Pieux de Profondeurs variables 20 à 47 mètre |
MUNICIPALITE DE TUNIS |
PIEUX PLACE 7 NOVEMBRE A TUNIS |
2001 |
1.400.000 DT |
Pieux Forés 990 ML (PRF 55m) + Palplanches |
UBCI |
PIEUX AGENCE BANCAIRE A MEGRINE |
2001/2002 |
600.000 DT |
Pieux Forés + Palplanches |
POLYSIUS S.A. |
PIEUX CIMENTERIE ENFIDHA |
2002 |
2.000.000 DT |
300 Pieux de 23 mètres |
S.N.C.F.T. |
PIEUX OUVRAGES D'ART SNCFT - BOUKORNINE |
2002 |
650.000 DT |
88 Pieux de 23 mètres |
GROUPE CHIMIQUE DE GABES |
PIEUX USINE SAEPA |
2003 |
330.000 DT |
|
MINISTERE DE L'EQUIPEMENT |
PRISON CIVIL SIDI ALI HATTAB |
2003 |
3.000.000 DT |
1100 Pieux de 18 mètres |
MINISTERE DE L'EQUIPEMENT |
PIEUX SALLE DE SPORT DE RADES |
2003 |
2.000.000 DT |
Pieux de Profondeur 20 à 26 mètres |
TUNISIE AUTOROUTE |
PIEUX PONT OUED MEDJERDAH - AUTOROUTE MEDJEZ-ELBAB |
2003 |
800.000 DT |
Pieux de Profondeur 26 mètres |
CIMENTERIE JEBEL JELOUD - CAT |
PIEUX POUR CILOS CLINKER ET SILOS CIMENTS |
2004 |
700.000 DT |
Pieux de 20 mètres |
GROUPE CHIMIQUE DE GABES |
PIEUX USINE SAEPA (PROJET TRAITEMENT ACIDE) |
2005 |
200.000 DT |
|
ONAS |
PIEUX STATION D'EPURATION DE LA VILLE AOUSDJA |
2005/2006 |
|
282 Pieux 26 mètres |