CLIENTS |
REFERENCES PROJETS |
ANNEES DE REALISATION |
MONTANT
DES
TRAVAUX |
SPECIFICITE |
LIGNES DE CHEMINS DE FER ET OUVRAGES D'ART |
MINISTERE
DE L'EQUIPEMENT |
PONT SOUSSE/KAIROUAN SUR
OUED ZEROUD |
1970/1971 |
464.000 DT |
LONGUEUR 300 METRES
(STRUCTURE MIXTE) |
S.C.G. |
DESSERTE DE LA CIMENTERIE DE GABES |
1976/1977 |
370.000 DT |
EN GROUPEMENT AVEC STE FOUGEROLLE |
S.N.C.F.T. |
RECONSTRUCTION DU PONT SIDI BOU-ALI |
1979/1980 |
580.000 DT |
REALISEE EN 14 MOIS
( 25000 M3 DE BETON ) |
S.N.C.F.T. |
LIGNE FERROVIAIRE GAFSA / GABES |
1980/1981 |
1.394.000 DT |
|
S.N.C.F.T. |
PONT DE GAAFOUR |
1981/1982 |
320.000 DT |
|
S.N.C.F.T. |
LIAISON FERROVIAIRE SOUSSE / MONASTIR |
1982/1982 |
554.000 DT |
|
S.N.C.F.T. |
LIGNE ELAROUSSA SIDI AYED |
1981/1984 |
1.064.000 DT |
|
S.N.C.F.T. |
PONT SUR OUED MAOU |
1984/1985 |
1.444.000 DT |
REALISE EN 6 MOIS
PONT DALLE 215 METRES |
MINISTERE DE L'EQUIPEMENT |
PONT SUCRERIE JENDOUBA |
1988/1989 |
506.000 DT |
|
S.N.C.F.T. |
PONT OUED EL MELAH |
1989/1990 |
630.000 DDT |
|
S.N.C.F.T. |
PONT SUR OUED AGEREB |
1990/1991 |
1.531.000 DT |
LONGUEUR = 160 METRES |
MINISTERE DE L'EQUIPEMENT |
PONT OUED ZARGA |
1992/1993 |
2.805.000 DT |
LONGUEUR = 215 METRES |
S.N.C.F.T. |
PONT OUED KHEROUA SFAX |
1993/1994 |
1.049.000 DT |
PONT DALLE 64 METRES |
S.N.C.F.T. |
OUVRAGE SUR HENCHIR SOUATIR |
1993/1994 |
1.481.983 DT |
2 PONTS DALLE 92 METRE |
MINISTERE DE L'EQUIPEMENT |
PONT SUR OUED HAJJAR / KELIBIA |
1994/1995 |
1.195.000 DT |
LONGUEUR = 42 METRES |
MINISTERE DE L'EQUIPEMENT |
PONT SUR OUED MLIZ/ JENDOUBA |
1994/1995 |
793.000 DT |
LONGUEUR = 42 METRES |
S.N.C.F.T. |
OUVRAGE FERROVIAIRE OUED EL MELAH LOT - 2 |
1996/1997 |
1.330.000 DT |
|
S.N.C.F.T. |
OUVRAGE FERROVIAIRE OUED HCHICHINA |
1996/1997 |
1.110.000 DT |
|
S.N.C.F.T. |
OUVRAGES FERROVIAIRES LOTS 7 & 8 |
1996/1997 |
959.000 DT |
DALOTS |
MINISTERE DE L'EQUIPEMENT |
PONT OUED EL HAMMEM |
1996/1997 |
2.450.000 DT |
PONT 85 ML, POUTRE PRECONTRAINTES |
S.N.C.F.T. |
LIGNE TUNIS - ALGER / OUVRAGE DE STABILISATION
SUR OUED MEDJERDA |
1996 |
700.000 DT |
Palplanches |
A F H |
PONT OUED SOLTAN |
1996/1997 |
1.900.000 DT |
PONT 85 ML, POUTRES DE
21 M (TABLIER DE 17 ML) |
S.N.C.F.T. |
PONT OUED MELIANE - RADES
ET PONT OUED DEFLA BIR BOU REGBA |
1997 |
1.064.000 DT |
PONTS RAIL A POUTRE
SUR PIEUX |
S.N.C.F.T. |
OUVRAGES FERROVIAIRES LOTS 9&10 |
1997 |
1.524.638 DT |
DALOTS |
MINISTERE DE L'EQUIPEMENT |
PONT OUED LEBEN |
1996/1998 |
3.128.617 DT |
PONT 45 ML EN POUTRES
PRECONTRAINTES |
MINISTERE DE L'EQUIPEMENT |
PONT OUED EL JILF - SILIANA |
1997/1998 |
1.420.000 DT |
PONT DE 63 ML |
O P A T |
EXTENSION OUVRAGES D'ART VIADUC + TUNNEL |
1996/1998 |
10.000.000 DT |
PONT DE 330 ML /17 ML Lar |
MINISTERE DE L'EQUIPEMENT |
PONT SUR OUED BEJA |
1997/1998 |
1.328.000 DT |
LONGUEUR = 30 ML |
MINISTERE DE L'EQUIPEMENT |
OUVRAGE OUED BOU DHEBENE EL FAHS GP 4 |
1997/1998 |
920.000 DT |
LONGUEUR = 45 ML |
MINISTERE DE L'AGRICULTURE |
OUVRAGES OUED R'MEL ET HAMMAM ROUTE MC 35 |
1997/1998 |
4.132.000 DT |
PONTS A POUTRES
PRECONTRAINTES 30 ML |
MINISTERE DE L'EQUIPEMENT |
PONT SUR OUED KHOL & MELLEGUE LE KEF |
1998/2000 |
2.173.274 DT |
PIEUX + PALPLANCHES |
MINISTERE DE L'EQUIPEMENT |
OUVRAGE PONT TAMAGHZA |
1999/2000 |
1.370.000 DT |
OUVRAGE D'ART |
MINISTERE DE L'EQUIPEMENT |
OUVRAGE PONT BOUHERTHMA |
1999/2000 |
890.000 DT |
OUVRAGE D'ART +PALPLANCHE |
S.N.C.F.T |
RENFORCEMENT OUVRAGES D'ART TUNIS-SOUSSE |
1998/2000 |
2.000.000 DT |
|
MINISTERE DE L'EQUIPEMENT |
DEDOUBLEMENT DE LA DEVIATION DE SOUSSE |
1999/2000 |
2.170.000 DT |
OUVRAGE D'ART |
MINISTERE DE L'EQUIPEMENT |
OUVRAGE PONT EL MELAH / BIZERTE |
1999/2000 |
1.370.000 DT |
OUVRAGE D'ART |
MINISTERE DE L'EQUIPEMENT |
PONT SUR OUED HATAB |
1999/2000 |
1.324.945 DT |
PONT EN BETON PRECONTRAINT
LONGUEUR 120 mètres |
MINISTERE DE L'EQUIPEMENT |
ECHANGEUR D'EL MENZAH |
1998/2000 |
5.421.795 DT |
EN GROUPEMENT AVEC ETEP |
S.N.C.F.T |
PASS. INF. POUR PIETONS GARE DE HAMMAM - LIF |
1999/2000 |
1.372.000 DT |
PALPLANCHES |
S.N.C.F.T |
PASS. INF. POUR PIETONS GARE DE RADES |
1999/2000 |
1.273.000 DT |
PALPLANCHES |
MINISTERE DE L'EQUIPEMENT |
PONT SUR OUED CHARA - HAFFOUZ / KAIROUAN |
1998/2000 |
790.000 DT |
OUVRAGE D'ART |
MINISTERE DE L'EQUIPEMENT |
CONSTRUCTION DEUX PONTS MOBILES A SFAX |
1998/2001 |
4.176.000 DT |
DEUX PONTS EN CHARPENTES
METALLIQUES (Route + Rail) |
MINISTERE DE L'EQUIPEMENT |
PONT SUR OUED SBIBA |
2000/2001 |
1.470.000 DT |
PONT BETON ARME LONGUEUR 84 mètres |
TUNISIE AUTOROUTE |
CONSTRUCTION OUVRAGES D'ART AUTOROUTE
TUNIS - BIZERTE |
2000/2002 |
18.000.000 DT |
COMPREND :
¤ 13 PASSAGES SUPERIEUR
¤ 3 PASSAGES INFERIEUR
¤ 3 GRANDS OUVRAGES DOUBLES |
S M L T |
SUBSTITUTION DE TABLIER - OUVRAGE D'ART LIGNE TGM |
2002 |
309.437 DT |
OUVRAGE D'ART |
S.N.C.F.T |
OUVRAGE DE DENIVELLATION A BOUKORNINE |
2003 |
3.637.000 DT |
OUVRAGE D'ART SUR PIEUX FORES :
* AXE APPUIS NORD 215 ML
* AXE APPUIS SUD 210 ML EN TOTAL = 425 ML |
MINISTERE DE L'EQUIPEMENT |
PONT SUR OUED BAGRATE DANS LE GOUVERNORAT
DE BIZERTE |
2003/2003 |
1.500.000 DT |
OUVRAGE D'ART SUR PIEUX FORES DE 30 M DE PROFONDEUR AVEC 2 TRAVEES DE 15 ML CHACUNE |
MINISTERE DE L'EQUIPEMENT |
CONSTRUCTION DE TROIS PASSAGES PIETONS SUR LES ROUTES RN8 AU PK3 - RN9 & SORTIE SUD DE TUNIS |
2003 |
813.853 DT |
OUVRAGES EN POUTRES PREFABRIQUEES |
SMLT |
OUVRAGE DE DENIVELLATION AU DROIT DE PASSAGE A NIVEAU DE SIDI DRHIF |
2004 |
1.900.000 DT |
OUVRAGE D'ART L=64 m /4 TRAVEES ET MURS DE SOUTENNEMENT |
TUNISIE AUTOROUTE |
CONSTRUCTION OUVRAGES D'ART AUTOROUTE TUNIS - MEDJEZ-EL BAB / 3ème TRANCHE |
2002/2004 |
14.000.000 DT |
COMPREND :
¤ 4 PASSAGES SUPERIEURS
¤ 3 PASSAGES INFERIEURS
¤ 2GRANDS OUVRAGES SUR PIEUX
FORES DE 30 ML DE PROFONDEUR AVEC 5 TRAVEES DE 37 ML CHACUN
( EN TOTAL 370 ML ) |
SONEDE |
FRANCHISSEMENT DE CONDUITE AEP SUR L'OUED MEDJERDA AU NIVEAU DE JEDEIDA |
2005 |
800.000 DT |
OUVRAGE D'ART FONDE SUR PIEUX
Ø 1000mm & PROFONDEUR 17 ML |
SNCFT |
REHABILISATION DE LA PLATE-FORME DE LA VOIE FERREE LIGNE 3 - MATEUR - BEJA |
2005 |
1.060.000 DT |
|
MINISTERE DE L'EQUIPEMENT |
PONT SUR OUED BAGRATE DANS LE GOUVERNORAT DE BIZERTE |
2003/2003 |
1.500.000 DT |
OUVRAGE D'ART SUR PIEUX FORES DE 30 M DE PROFONDEUR AVEC 2 TRAVEES DE 15 ML CHACUNE |
MINISTERE DE L'EQUIPEMENT |
CONSTRUCTION DE TROIS PASSAGES PIETONS SUR LES ROUTES RN8 AU PK3 - RN9 & SORTIE SUD DE TUNIS |
2003 |
813.853 DT |
OUVRAGES EN POUTRES PREFABRIQUEES |
SMLT |
OUVRAGE DE DENIVELLATION AU DROIT DE PASSAGE A NIVEAU DE SIDI DRHIF |
2004 |
1.900.000 DT |
OUVRAGE D'ART L=64 m /4 TRAVEES ET MURS DE SOUTENNEMENT |
TUNISIE AUTOROUTE |
CONSTRUCTION OUVRAGES D'ART AUTOROUTE TUNIS - MEDJEZ-EL BAB / 3ème TRANCHE |
2002/2004 |
14.000.000 DT |
COMPREND :
¤ 4 PASSAGES SUPERIEURS
¤ 3 PASSAGES INFERIEURS
¤ 2 GRANDS OUVRAGES SUR PIEUX
FORES DE 30 ML DE PROFONDEUR
AVEC 5 TRAVEES DE 37 ML CHACUN
( EN TOTAL 370 ML ) |
SONEDE |
FRANCHISSEMENT DE CONDUITE AEP SUR L'OUED MEDJERDA AU NIVEAU DE JEDEIDA |
2005 |
800.000 DT |
OUVRAGE D'ART FONDE SUR PIEUX
Ø 1000mm & PROFONDEUR 17 ML |
SNCFT |
REHABILISATION DE LA PLATE-FORME DE LA VOIE FERREE LIGNE 3 - MATEUR - BEJA |
2005 |
1.060.000 DT |
|